FRONT
DONE
–removed dead/ugly trees and shrubs
–added rock, agaves, queen palms, and flax
–painted siding, beams and fascia
–added letter plate and Eichler number/light
–stenciled modern curb number
–installed secondary front door
TO DO
–remove (weed-filled) front lawn
–design/install drought-tolerant landscaping
–install concrete steps, leading to entrance
–re-pour driveway concrete, eventually
BEFORE
AFTER