MASTER BATHROOM
DONE
–reinstated original bathroom cabinet
–demo’d shower due to mold issue
–restored shower room door
–replaced counter, sink, and light fixture
–installed VCT and painted cabinet (again)
–added closet and cabinet storage
TO DO
–remodel shower room (BIG project!)
BEFORE
AFTER